26 signatures
Collecte terminée
Il s'agit d'une pétition en ligne du Parlement européen.
Petition richtet sich an: Petitionsausschuss des Europäischen Parlaments
The petitioner reports that the drainage of the Ioannina basin is done through the open basin of Lapsistas, which then ends in a closed tunnel, from which the water flows into the Kalamas river.The petitioner claims that the Lapsistas basin is heavily polluted by industry, livestock farming and wastewater treatment plants, resulting in the Kalamas basin being ranked by the “River Basin Management Plan of the Water Department of Epirus” as the most burdened and dangerous in Epirus.According to the petitioner, the heavy concentration of ammonia, which directly affects aquatic life, is the most critical pollution and a decisive parameter for determining the chemical status of a body of water as “good” or not under the terms of Directive 2000/60/EC. Therefore, serious questions arise as to whether the Management Plan reflects the actual chemical and ecological situation of the relevant water body or has been drafted on the basis of unreliable data and in violation of Directive 2000/60/EC and other legislation. Among others, the petitioner cites Directives 2010/75/ΕU, 2006/7/ΕC, 92/43/ΕEC, 2009/147/ΕC, 98/83/ΕC, 2015/1787/ΕU,.
Lien vers la pétition
Fiche détachable avec code QR
télécharger (PDF)détails de la pétition
Petition gestartet:
24/09/2019
Petition endet:
23/09/2020
Région:
Union européenne
Catégorie:
Environnement
Débat
Pas encore un argument CONTRA.