Ambiente

On the construction of a composting plant to treat solid waste 

A petição é dirigida a
Petitionsausschuss des Europäischen Parlaments
1 apoiador 1 em União Europeia

Colecta finalizada

1 apoiador 1 em União Europeia

Colecta finalizada

  1. Iniciado 2020
  2. Colecta finalizada
  3. Preparar submissão
  4. Diálogo com o destinatário
  5. Decisão

Esta é uma petição online do Parlamento Europeu.

A reencaminhar

The petitioner complains about the establishment of a plant for the treatment of separately collected organic waste (FORSU), which was already authorised and financed under the Apulia Regional Operational Programme (2014-20). In particular, the petitioner claims that the future plant will not comply with requirements concerning minimum distances from homes (2 km) and from sensitive sites of the school type (2.5 km) and that it could interfere with the nearby production of high-quality wine (Primitivo di Manduria). The petitioner alleges infringement of Article 168 TFEU on public health and Directive 2008/98/EC on waste as regards the protection of human health and the environment, and calls for the EU to intervene.

Link para a petição

Imagem com código QR

Deslizamento destacável com código QR

fazer o download (PDF)

Ainda não há nenhum argumento a favor (PRO).

Ainda não há nenhum argumento CONTRA.

Ajude a fortalecer a participação cívica. Queremos que as suas preocupações sejam ouvidas, permanecendo independentes.

Apoiar agora