Prostředí

On the construction of a composting plant to treat solid waste 

Petice je adresována
Petitionsausschuss des Europäischen Parlaments
1 1 v Evropská unie

Sbírka byla dokončena

1 1 v Evropská unie

Sbírka byla dokončena

  1. Zahájena 2020
  2. Sbírka byla dokončena
  3. Připravit podání
  4. Dialog s příjemcem
  5. Rozhodnutí

Toto je petice online Evropského parlamentu .

forwarding

The petitioner complains about the establishment of a plant for the treatment of separately collected organic waste (FORSU), which was already authorised and financed under the Apulia Regional Operational Programme (2014-20). In particular, the petitioner claims that the future plant will not comply with requirements concerning minimum distances from homes (2 km) and from sensitive sites of the school type (2.5 km) and that it could interfere with the nearby production of high-quality wine (Primitivo di Manduria). The petitioner alleges infringement of Article 168 TFEU on public health and Directive 2008/98/EC on waste as regards the protection of human health and the environment, and calls for the EU to intervene.

Odkaz na petici

Obrázek s QR kódem

Odtrhávací lístek s QR kódem

download (PDF)

rozprava

Zatím žádný argument PRO.

Zatím žádný argument CONTRA.

Pomozte posílit občanskou účast. Chceme, aby vaše obavy byly vyslyšeny a zůstaly nezávislé.

Povýšte nyní