Ambiente

On the construction of a composting plant to treat solid waste 

La petizione va a
Petitionsausschuss des Europäischen Parlaments
1 sostenitore 1 in Unione europea

Raccolta voti terminata

1 sostenitore 1 in Unione europea

Raccolta voti terminata

  1. Iniziato 2020
  2. Raccolta voti terminata
  3. Preparare la presentazione
  4. Dialogo con il destinatario
  5. Decisione

Questa è una petizione online del Parlamento europeo .

Inoltro

The petitioner complains about the establishment of a plant for the treatment of separately collected organic waste (FORSU), which was already authorised and financed under the Apulia Regional Operational Programme (2014-20). In particular, the petitioner claims that the future plant will not comply with requirements concerning minimum distances from homes (2 km) and from sensitive sites of the school type (2.5 km) and that it could interfere with the nearby production of high-quality wine (Primitivo di Manduria). The petitioner alleges infringement of Article 168 TFEU on public health and Directive 2008/98/EC on waste as regards the protection of human health and the environment, and calls for the EU to intervene.

Link alla petizione

Immagine con codice QR

Slip a strappo con codice QR

download (PDF)

Non è ancora un argomento PRO.

Non è ancora un argomento CONTRA.

Contribuisci a rafforzare la partecipazione civica. Vogliamo che le tue istanze siano ascoltate e allo stesso tempo rimanere indipendenti.

Promuovi ora