Successo
Immagine della petizione Repair the dangerous schoolyard in St Julian's Primary / St Clare College, Malta

Repair the dangerous schoolyard in St Julian's Primary / St Clare College, Malta

Firmatorio non aperto al pubblico
La petizione va a:
Mr. Clifton Grima, Minister for Education, Youth, Resources and Innovation

86 Firme

La petizione ha contribuito al successo

86 Firme

La petizione ha contribuito al successo

  1. Iniziato novembre 2024
  2. Raccolta voti terminata
  3. Presentata
  4. Dialogo
  5. Successo

La petizione ha avuto successo!

Novità

18/11/2024, 06:09

updated to correct typos and add information


New petition description:

The yard in St Julian's Primary/St Clare College is damaged and dangerous.

  • Children are routinely slipping and injuring themselves on the rubberised surface which has now disintegrated to gravel.
  • The longest surrounding wall is slowing falling away,collapsing, due to damagesubsidence. fromThere is a sheer drop to a busy road on the rootsopposite of trees. side.
  • There are no shaded parts, which makes playtime in summer heat unnecessaryunnecessarily uncomfortable, and outside breaksbreaktimes in even light rain showers are impossible.
  • Childrens' shoes and uniforms are being damaged and torn due to falls, placing unnecessary hardship on parents to replace.

Despite making repeated requests for assistance through all the proper channels, the school have still not been allocated the essential funding for these remedial works to take place.



New deadline: 14.05.2025
Signatures at the time of the change: 36


Contribuisci a rafforzare la partecipazione civica. Vogliamo che le tue istanze siano ascoltate e allo stesso tempo rimanere indipendenti.

Promuovi ora